GRG AFC Equipments in Installation and Test for Guangzhou Metro

GRG Service Engineers testing installed GRG AFC equipments


300 GRG AFC equipments in 24 stations for Guangzhou Subway Line 5 have been under installation, following the successful opening of Beijing Subway Line 1 and Line 2 with GRG AFC equipments.


40.5 kilometres long, Guangzhou Subway Line 5 is one of the main traffic lines of Guangzhou railway. To be open in October of 2009, it is estimated to transport a daily passenger flow of 300, 000 people.


By now, a total of 3000 GRG AFC terminals and devices have been applied in 6 cities including Guangzhou, Beijing, Nanjing, Shenzhen, Wuhan and Tianjin.